기본 콘텐츠로 건너뛰기

How to add r-410 Refrigerant

How to Add R-410 Refrigerant

By Robert Sylvus

An azeotrope refrigerant blends multiple refrigerant compounds to form a single refrigerant. Most refrigerant blends boil at different rates and require complete evacuation before adding a full charge. This is not the case with so R-410, which is considered a near-azeotrope, using compounds that boil at almost the same rate. Manufacturers include a refrigerant charge in new air conditioning systems that will provide the correct amount of refrigerant for the unit and a 15 to 25 foot refrigerant line set. Long line sets, the copper lines that the refrigerant travels through, will require additional R-410 refrigerant.

...
R-410 refrigerant operates at a higher pressure than R-22.
Step 1

Turn the air conditioning system off at the thermostat.

Step 2

Check the identification tag on the outdoor condensing unit to verify the system uses R-410 as a refrigerant. Mixing R-410 with any other refrigerant will cause the compressor to seize.

Step 3

Connect the middle hose from an R-410 refrigeration manifold gauge set to a jug of R-410 (pink colored). Most hoses use screw-on fittings, but some use low-loss fittings that snap into place.

Step 4

Open the R-410 jug's valve by turning the handle clockwise.

Step 5

Remove the caps from both service valves, found where the refrigerant lines enter the condenser. Use an adjustable wrench to loosen them, if needed. The liquid refrigerant service valve connects to the small copper refrigerant line. The large refrigeration line, called the suction line, holds the vapor refrigerant as it returns to the condenser.

Step 6

Open the manifold's right-hand handle for one second then close the handle. This will purge the air and moisture from the manifold and the high-pressure hose. The handle opens when turned clockwise.

Step 7

Connect the hose on the manifold's right-hand side, high-pressure side, to the liquid refrigerant's service valve port. Screw-on fittings will screw onto the port, whereas low-loss fittings will snap into place.

Step 8

Purge the low-pressure, left-hand side hose for one second.

Step 9

Connect the manifold's low-pressure hose, left-hand side, to the suction-line service valve's port. Screw-on fittings will screw onto the port, and low-loss fittings will snap into place.

Step 10

Turn the air conditioner on at the thermostat. Allow the system to run for 10 minutes.

Step 11

Measure the temperature of the liquid refrigerant line 6 inches from the service valve with a thermometer. Write down this measurement.

Step 12

Check the high-pressure gauge, right-hand side, on the R-410 manifold set. The gauge will have a pressure reading in pounds per square inch gauge (PSIG) and a R-410 refrigerant saturation temperature measured in degrees Fahrenheit (F).

Step 13

Subtract the PSIG reading from the F reading. The resulting number will equal the subcooling value.

Step 14

Check the condenser's label for the designed subcooling value. If the calculated subcooling value reads less than the stated subcooling valve, then add R-410 to the system. Do not overcharge the system. Technicians often allow +/- 3 degrees for measurement error.

Step 15

Flip the R-410 refrigerant jug over. Always charge R-410, as a liquid, with the valve and hose facing the ground. Vapor charging will separate the refrigerant blend.

Step 16

Throttle the low-pressure, left-hand side manifold valve for 60 seconds. Throttling, i.e., opening and closing the valve every five seconds, will deliver a fully mixed refrigerant blend in liquid form without flooding the compressor.

Step 17

Allow the system pressures to equalize. When the gauge's needles have stopped dropping, the system pressures have equalized. This can take up to two minutes.

Step 18

Calculate the new subcooling value and compare it to the designed subcooling value as stated on the condenser's label. Add R-410 refrigerant as needed.

Step 19

Close the manifold and R-410 jug's valve handles. Disconnect the hoses and reinstall the caps on the service valve's ports.

댓글

이 블로그의 인기 게시물

iSmile Dental - Taurus C1 installation

- 행적 : 8시 집 출발 -> 9시 사무실 도착, 및 준비물 챙김 -> 10시 창고 도착 -> 10시 30분 제품 확인 후에 싣고 병원으로 출발 -> 11시 iSmile 도착 -> 오후 5시 30분 설치 완료 및 출발 -> 전상태씨 베이사이드 역에 데려다 줌 -> 6시 30분 하버디언치과 들어 닥터 송 만남. -> 7시부터 저녁 ->9 시 50분 헤어져 사무실로 출발 -> 10시 30분 사무실 도착, 업무 정리하고 12시 30분 집으로 출발 - 사진 정리 - 의견

Rayscan installation (Junsung Ha DDS at Fort Lee)

1. 6/17/2016 : 하준승 치과 (Junsung Ha DDS) Rayscan Pano 제품을 설치했다. 대부분 평이한 설치였지만 몇 가지 아쉬운 점이 있었다. 첫째는 레이측의 실수로 설치일이 하루 미뤄진 것이고 둘째는  Network card의 초기 애로로 인해 촬영을 지속적으로 할 수 없는 DOA 이슈가 있었다. 설시 시 주의할 점을 정리하면.. 1. 설치 공간 깊이가 최소 5' 2" 정도는 되어야 한다. 월마운트를 하지 않는다면 5'로도 문제 없지만 월마운트를 하려면 5' 는 최소이며 매우 아슬아술하다. 최소 5' 1" 정도가 아마 최소 필요공간이 아닐까 싶다. 2. 초기 고정 브라켓 제거 관련 고정 브라켓 제거 방법이 변경되었다. 금번에는 고정 브라켓을 제거한 후에 얻은 볼트를 X 축바깥쪽으로 로테이터를 이동시켜서 다시 고정하게 되게끔 방식이 바뀌었다. 3. PC 공간과 선정리 PC 공간은 선반 2개를 설치해 사용하는 방식이 무난한 것으로 생각된다. 간단하면서도 실용적이다. 다만 선정리에는 Flexible 과 Solid 를 함께 준비해야 한다.  비용은 선반 구입 30불, 모니터 마운트 15불, 선정리 커버 30불 도합75불 정도가 소요된다. 4. Rayscan 실행시에 방화벽(Firewall)를 끄지 않으면 촬영된 이미지가 장비에서 안넘어오는 상황이 발생할 수 있다. 그러므로 반드시 Firewall을 꺼놓도록 한다. 정상적인 촬영단계를 거치다가 Ready 를 클릭한 후에 그 다음 단계로 넘어가지 않는 현상으로 이어진다. 5. Network card 고장시에는 Exposure switch 누른 후에 Scanning 이라는 메세지만 뜨고 파일로 만들어지는 단계로 넘어가지 않는 현상이 발생된다. 아울러 Exposure 가 끝날 때에 Beep 음이 나지 않는다.         ...

Kavo VS. MDK

-  행적 : 12시 30분 점심 먹고 집 출발 => 사무실 들러 핸드피스 같은 것 챙겨서 => 뉴욕으로 출발 => 하바디언 들려 임프레션, 힐링 배달하고 => DC 들려 Air motor 교체 해주고 => 홍치과 들려 센서 교체해주고 => 뉴저지로 돌아와 나이스 덴탈랩 배달하고 => 하나치과 들려 정리 방안 확정하고 집으로 돌아옴